1. Public Works— In pursuance of Reg. 105 of the Coal Mines Regulation, 1957, the Central Govt. has directed that the works, specified in column I of the Schedule below shall be public works for the purpose of the said Regulation and that a copy of the application for permission in relation to these works required to be submitted to DGMS under sub-regulation (1) of the said Regulation shall also be sent to the authority specified against the respective works in column 2 of the schedule.

SCHEDULE

(a) Aerial ropeways The public authority owning the Aerial Ropeway.

(b) High-tension transmission lines The public authority owning the transmission lines.

(c) Water and gas 'mains' above 60 cm.

dia.

The public authority owning the water or gas 'main'.

Govt. of India-Ministry of Labour-Order No. S.O.FM-1(94)58 dt. 11th Dec. 1958.

2. Inspection of workings beneath important surface features—In order to keep a check on the condition of workings (both present and disused) beneath and within the statutorily restricted areas for ANNEXURE-I SUPPORT DESIGN CELL (AREA LEVEL)

TRAINISC, OF PERSONNEL -ROCK MASS CLASSIFICATION SYSTEM -METHODOLOGY OF BOLTING -FIELD INSTRUMENTATION SELECTION & PROCUREMENT OF INSTRUMENTS/EQVIPMENTS -FOR DETERMINING R.M.R.

-FOR BOLTING & MONITORING STRATA MOVEMENT IDENTIFICATION OF LOCALES (MINE)

GEOLOGICAVGEOTECHNICAL INVESTIGATION & LABORATORY TESTING SUPPORT PERFORMANCE MONITORING ANALYSIS OF DATA DETERMINATION OF R.M.R- DESIGN OF SUPPORT SYSTEM FORMULATION OF S.S.R.

IMPLEMENTATION OF SUPPORT SCHEME ,EOTECHNICAL DATA BANK .1NSTAIÄTION OF INSTRUMENTS MONITORING OPERATION GEOTECHNICAL ANALYSIS FEED BACK ON SUPPORT BEHAVIOR FINAL RECOMMENDATIONS ON SUPPORT SYSTEM REVISION OF S.S,R. aF NECESSARY)

PERIODIC ASSESSMENT OF C,EO-MINING CONDITION CIIANGE CONTINUEDEVELOPMENT SAME S S.R.

SUGGESTED SYSTEMS APPROACH TO DEVELOPMENT SUPPORT DESIGN IN COAL MINES mnonoo

(a) rivers and jores etc.

(b) roads and railways,

(c) dwellings and other structures.

(1) It is considered advisable that a regular inspection of such workings should be made once at least in every month by a person holding an overman's certificate or a manager's certificate and written record of such inspections should also be maintained, and duly countersigned by the manager.

(2) Such workings should be inspected once atleast in every 3 months by the manager personally. Protective measures, as and when necessary, should be taken to keep the workings in a satisfactory condition.

(3) All the approach roads to such workings should be kept adequately supported.

(4) To facilitate inspections, each pillar of such workings should be marked all round on the sides, at a convenient height, by a white band in lime wash having width not less than 15 cm.

(Cir. 1/1960)