2. Standards of accuracy of mine plans and sections : Specifications of Limits of Error— In pursuance of Reg. 58(3) of CMR 1957 and Reg. 60(3) of the MMR 1961, it is hereby required that all plans and sections prepared or submitted in accordance with the provisions of the regulations shall be accurate within the limits of error as specified in the Appendix below.
APPENDIX SPECIFICATION OF LIMITS OF ERROR Plans 3.1 Accuracy of Correlation with Survey of India National Grid—The positions of the surface reference stations and the centres of all mine shafts at the surface and reference points of underground surveys and also the boundaries of the mine and all surface features required to be shown shall be shown upon the key and Master Plans in their correct positions relative to the Survey of India National Grid within the limits of error of survey and plotting required by this Code (See para 2.3)
3.2 Plotting Errors—All surface and underground surveys made and carried out in accordance with this Code shall be plotted on the plan of the mine so that, in the case of a plan on the scale of 1/2,000, all points in the survey are correct by scale to their calculated co-ordinate position within a limit not exceeding 50cm. In case of a plan prepared on the scale of 1/1,000, the corresponding limit of error shall not exceed 25cm.
Surface Surveys 3.3 Triangulation Station Points— The position of every station point of triangulation with reference to the point of origin of the survey, calculated from an initial base line (or the Survey of India topo triangulation stations) shall agree with the position of that station point, calculated from a verification base line, within a limit of error not exceeding l/5,000th of the linear horizontal distance of the station point from the point of origin.
3.4 Traverses—Every traverse made between station points of a triangulation and/or for the determination of the boundaries of the mine or for the determination of other important surface details, shall be closed Polygonally and shall be made within limits of error as follows :
(i) The total angular error of the traverse shall not exceed 30/n seconds when 'n' is the number of observing stations (including the initial and closing stations).
(ii) The error of closure (calculated by co-ordinates) after distribution of the total angular error shall not exceed 1/3,000th of the sum of the horizontal lengths of the drafts of the traverse.
Underground Surveys 3.5 Instruments for Main Road Traverses—Every traverse made to determine or check the position of an underground survey station or to check the position of the main roadways of a mine shall be made with a theodolite the smallest reading of which does not exceed 20 seconds of arc, and all measurements shall be made with a steel band or steel tape not less than 30 metres in length.
3.6 Angular Error of Closed Traverses— The total angular error of any underground traverse or check survey which has been closed polygonally shall not exceed (20+x)/n second in which expression the value of 'n' is 10 seconds or the smallest reading in seconds of sub-division of the circle of the instrument employed (whichever is greater) and 'n' is the number of observing stations.
3.7 Co-ordinate Error of Closed Traverses— The error of closure of any underground traverse of check survey which has been closed polygonally (calculated by co-ordinates after distribution of the total angular error) shall not exceed l/2,500th of the sum of the horizontal lengths of the drafts of the traverse.
3.8 Co-ordinate Error of Open Traverses—Where an underground traverse has commenced from and closed upon surface reference points upon survey stations of which the co-ordinates have previously been determined, but has not been closed polygonally, the error of closure (calculated by co-ordinates) shall not exceed l/l,500th of the sum of the horizontal lengths of the drafts of the traverse.
3.9 Subsidiary Surveys— Subsidiary surveys, to determine the position of any line of face or goaf and the positions or road junctions made between any two stations of check survey, shall have a permissible limit of error of closure by plotting not exceeding l/500th of the sum of the horizontal lengths of the drafts of the survey.
3.10 Checking Subsidiary Surveys—Where it is impracticable to maintain underground check survey stations, and/or where subsidiary surveys cannot be closed upon check survey stations, the difference in location of any point on the line of face or goaf as determined by any two or more such surveys shall not exceed 3 metres.
3.11 Errors of Correlation by Wires—The correlations of the surface and the underground workings carried out by :
(i) Single wire in each of/two or more shafts, Or
(ii) two or more wires in a single shaft shall be deemed to be within the required limit of error when the difference in value of the azimuth of any reference line of the underground survey relative to the surface reference base line, as determined by two or more independent series of observations between wires, does not exceed two minutes of arc.
3.12 Errors of Magnetic Correlation—The correlation of the surface and underground workings by precise magnetic observations (carried out by magnetic observations on the surface reference base line and by magnetic observations on not less than two underground observation lines, each tested independently for magnetic attraction, and connected by traverse survey carried within the limit of error required by para 3.7 above) shall be deemed to be within the required limit of error when (after distribution of the permissible angular error in the traverse connecting the underground observation base lines) the difference of azimuth between those base lines so determined agrees with the difference of bearing between the base lines as determined by magnetic observation relative to the surface reference base line, within a limit of error not exceeding two minutes of arc.
3.13 Errors of Correlation by Direct Connection—For the correlation of -the surface and underground workings by direct connections through adits and inclines the traverse connection from, or between the points of reference to the surface shall be carried out within a limit of error required by para 3.7 of the Code, and the correlation shall be deemed to be within the required limit of error when (after distribution of the permissible angular error in the traverse)
the values of the azimuth of any underground reference line, relative to the surface reference base line, as determined by any two or more such independent surveys, agree within a limit of errors not exceeding one minute of arc.
Levels 3.14 Errors of Surface Levels—The leveling to determine mine surface bench marks shall commence from a railway bench mark and close upon a second railway bench mark within a limit of error not exceeding 2 cm. per km. After Survey of India bench marks are available, the railway bench marks and Survey of India bench marks shall be linked by a leveling within a limit of error not exceeding 2 cm. per km. and thereafter a note shall be made on the plan giving the correction relating to the surface bench mark value with the Survey of India leveling and National Datum lines.
3.15 Errors for Underground Bench Marks—The levels of shaft inset bench marks shall be determined by shaft measurements and shall be deemed to be within the required limit of error when any two or more measurements from the surface bench mark to the mine inset bench mark agree within a limit of error not exceeding l/5,000th.
3.16 Error of Underground Leveling—All underground leveling made to determine or check the levels of underground bench marks shall close within a limit of error not exceeding l/2,500th of the inclined length of the route of the leveling.
3.17 Subsidiary Levels—In the case of subsidiary levellings made to determine the level of any point on a line of face or goaf or of any other part of the workings and which are not closed between underground bench marks, the difference in the levels of any such point as determined by any two or more such leveling shall not exceed 50 cm.
SUMMARY OF LIMITS OF ERROR Plans Plans on the 1/2,000 scale 50 centimetres Plans on the 1/1,000 scale 25 centimetres
(i) Triangulation Position of stations of the triangulation as determined from initial and verification bases l/5,000th of the lines horizontal distance of local point of origin.
(ii) Traverses Total angular error 30/n seconds Error of closure l/3,000th of the horizontal length of the traverse Underground Surveys
(i) Traverse closed polygonally Total angular error (20+X)/n seconds Error of closure l/2,500th the horizontal length of the traverse
(ii) Traverse not closed polygonally but closed upon reference points Error of closure 1/1,500th of horizontal length of the traverse
(iii) Subsidiary Surveys Error of closure by plotting l/500th of horizontal length of the traverse Difference of two or more determinations of any subsidiary points 3 metres Correlations By shaft wires 2 minutes of arc By magnetic observations 2 minutes of arc By direct connection 11 minutes of arc Levels Surface mine bench marks 2 cms. per km.
Inset bench marks Two or more shaft measurements of established inset bench mark should agree within 1/5,000.
Inbye bench marks l/2,500th of the inclined length of the leveling.
Subsidiary points 50 centimetres.
(Cir. 20/1966 & Cir. 42/1967)