Cir Tech. 1/1973

Plugging of boreholes

Department
Technical
Year
1973
Collection
Regulation-wise digest (to 2017)
Under
CMR 127 / MMR 128
In the DGMS Circulars (up to June 2017) compilation, p. 333.
Open PDF at page 333

6. Plugging of boreholes—It is well known that prospecting boreholes put in a property, and which later get connected with underground workings can be a source of danger specially if they intersect a water-bearing strata or during or after a particularly heavy rainy season. It is, therefore, desirable that while planning lying out of workings in a seam, care should be taken to ensure that the boreholes do not get connected with underground galleries but are sited over solid pillars of coal. However, if some boreholes do get connected inadvertantly, the same should be kept plugged with cement grout. When a borehole is intended to be used for any purpose and it is intentionally connected with the underground workings, it should be suitably cased and the annular space between the borehole and the casing pipe filled up with cement grout effectively.

(Cir Tech. 1/1973)

Reproduced from the official DGMS circular compilations for public reference. The PDF is the authoritative text; DGMS may have amended or withdrawn older instructions since.

← Search all circulars