Skip to content

Cir. Tech. 2/1992

Taking proper shelter underground as envisaged in Reg. 170 of CMR 1957 and 164 of MMR 1961

Department
Technical
Year
1992
Collection
Regulation-wise digest (to 2017)
Under
CMR170/MMR164
In the DGMS Circulars (up to June 2017) compilation, pp. 398–399.
Open PDF at page 398

13. Taking proper shelter underground as envisaged in Reg. 170 of CMR 1957 and 164 of MMR 1961—In a recent accident one person was seriously injured and five others received minor injuries while a split gallery holed into the upper level and the blasting projectiles hit the person who had taken shelter in a rise gallery (off the gallery in which the blasted face joined).

This is illustrated by the sketch below:

In this connection attention is drawn to Cir. No. 16 of 1970 wherein it was suggested that negotiating two right angle bends for persons to take shelter would keep the people out of danger. In the instant case although the person had taken shelter after negotiating more than two bends, direction of bends was not judiciously chosen and the person took shelter at a place which was directly behind the split gallery.

This incident may be brought to the notice of all shotfirers/blasters as well as other officials connected with blasting operations for ensuring that the two right angle bends are negotiated in the direction away from the direction of blasting/progress of face.

(Cir. Tech. 2/1992)

Reproduced from the official DGMS circular compilations for public reference. The PDF is the authoritative text; DGMS may have amended or withdrawn older instructions since.

← Search all circulars