Skip to content

Cir. Tech. 2/1999

Accident in coal handling plant/crushing plant in mines

Department
Technical
Year
1999
Collection
Regulation-wise digest (to 2017)
Under
CMR182/MMR 172
In the DGMS Circulars (up to June 2017) compilation, pp. 444–446.
Open PDF at page 444

10. Accident in coal handling plant/crushing plant in mines—Recently an accident occurred in Coal Handling Plant of a coalmine in which the bunker structure collapsed and two persons were killed. Enquiry was conducted and samples of failed and other pillars were sent to a National Institute of Engineering Technology for failure analysis During enquiry by this Directorate, it was revealed that the design and drawing of the Coal Handling Plant was taken from a neighbouring mine of the same company. Capacity of bunker in the neighbouring mine was 100 tonnes, while the capacity of bunker of this mine was 160 tonnes. But the number and size of pillars were kept same i.e. 6 pillars of 356mm I section.

The conclusion of reports from National Institute of Engineering Technology was as follows:

1. The original bunker supporting structure of neighbouring mine was unsafe and was having poor stability. The bunker structure was serving at the cost of Factor of Safety and also full conceivable loads never occurred simultaneously. By increasing the capacity of Bunker in this mine it was made further unsafe. This Bunker structure was working in the plastic stage and with excessive deflection not permitted under code of practice (IS-800) and as such finally collapsed.

2. Fatigue cracks appeared to have propagated in the flange to a length of 40-50mm (almost 30% of the width of flange) resulting in possible bending of column and ultimately led to cleavage type of brittle fracture in remaining portion of I section leading finally to failure of pillars.

There had been failure of out door structures in various mines in the past also resulting in serious and fatal accidents. Similar failure of a twin steel bunker took place in another coal mine in 1996 when also it was noticed that the structure design was not stable due to inadequate factor of safety and the structure members subsequently got badly rusted and corroded and thus became further weak and subsequently collapsed after 7 years of use.

Based on the recommendations made in the report of the National Institute of Engineering Technology and the findings of the enquiries conducted by this Directorate, it is suggested that the following precautions shall be taken in order to prevent similar failures of structures.

1. The structures of Coal Handling Plant/Crushing Plant shall be designed taking into consideration all sorts of conceivable loads for making them safe as per Indian Standard code of practices IS 800. Adequate stability bracing shall be provided to avoid excessive deflection.

2. The composition of steel used in fabrication of structures shall be conform to IS 2062: 1992.

3. Steel used for fabricating the structure shall be free from defects as per IS 2062: 1992. The finished material should be reasonably free from surface flaws, lamination, rough/jagged and imperfect edge and all other harmful defects.

4. Foundation of all the pillars shall be shrouded with cement concrete so that water may not come in contact with steel to avoid corrosion/pitting etc. The surface area near pillar shall be cleaned regularly to remove coal/other materials piling above shrouded portion of pillar.

Adequate care shall be taken so that pay loaders tippers working under bunker do not damage pillars by hitting.

5. For detection of defects in the CHP/crushing plants of mines, all such structures may be examined by an expert team including a member having expertise in design of structures.

Suitable measures should be taken to strengthen the existing structures wherever required. A system of annual inspection of such structures using visual and non-destructive testing techniques shall also be introduced in all mines.

(Cir. Tech. 2/1999)