11. Precautions against danger of coal dust explosion while extracting pillars by opencast method—Attention is invited to DGMS (Technical) Cir. No. 11 of 1979 in which it was stipulated that LOX shall not be used for blasting in overburden within 15m of the underground workings in the coal seams immediately below or in the vicinity.

The above subject matter has been re-examined in consultation with the Director, CMRS and the Director ISM, and it is now suggested that to prevent danger of blown through into underground workings as a result of deep-hole drilling and blasting in overburden, the following precautions should be taken :

(1) No shothole shall be drilled in overburden above underground galleries.

(2) A parting of atleast 3m between the bottom of a shothole and the coal seam shall be left intact.

The above precautions have to be observed not only with LOX but with all other types of explosives used in opencast mines.

Following the recent explosion of coal dust while extracting pillars by opencast method, it is necessary to regulate the use of explosives in opencast mines so as to prevent a recurrence of the incident. The precautions to be taken in this connection are at present under discussion with the CMPDIL. However, meanwhile it is advised that precautions listed in the Appendix below should be taken.

APPENDIX PRECAUTIONS AGAINST DANGER OF COAL DUST EXPLOSION WHILE EXTRACTING PILLARS BY OPENCAST METHOD

1. Survey, cleaning and dusting—Where the u.g. workings are accessible, the same shall be surveyed and cleaned of coal dust and thickly stonedusted before commencement of extraction of pillars.

2. Withdrawal— All persons shall be withdrawn from u.g. in the same working seam or any other seam or section -connected therewith before commencement of blasting operations in the quarry, and no workpersons shall be re-admitted into the said u.g. workings unless and until the same have been inspected by a competent person duly authorised for the purpose and found free from any noxious gases and or signs of fire etc.

OR The underground workings to be quarried shall be isolated by explosion-proof stoppings or by any other approved manner from any active working area either in the same seam or different seam or section as the case may be, so as to prevent transference of danger to the said active working area.

3. Location of holes— The spacing of holes in the bench lying immediately above the coal seam (referred to hereinafter as last OB bench) shall be so adjusted that the holes do not lie immediately above the galleries as far as possible in order to ensure that the blastholes do not directly fire into the u.g. workings.

4. Safe parting— The depth of holes in the last OB bench shall be such as to leave atleast 3.0 metres thickness of OB above the coal seam, and to ensure compliance with this requirement, a pilot hole shall be put for each round of blasting to determine the total thickness of OB over the coal seam.

5. Filling sand in holes—Where there is any doubt particularly where there are cracks and crevices, the bottom 2 metre length of the hole shall be filled with sand.

6. Delay detonators not to be used—Unless otherwise permitted by DGMS in writing and subject to such conditions as may be imposed, no delay action detonators shall be used in coal, and the manner of extraction of pillars shall be by drilling and blasting holes in coal pillars only from top downwards.

7. Workings developed in more than one section— Where more than one section of the seam had been developed on pillars, the shotholes shall not be drilled to within 3 metres of a lower section, and care shall be taken that, as far as possible, the blastholes do not directly fire into any underground gallery.

8. Use of water ampoules/moist sand— All holes in the last OB bench and/or in coal shall be charged with water ampoules or with moist sand of atlest 0.6m in length at the bottom of the hole.

9. Shelter—No person including shotfirer shall take shelter within 100 metres of the quarry openings, and such shelter shall be of an approved design.

10. Administrative control—The opencast workings and underground set of workings shall be under the administrative and technical direction and control of the same Manager and/or Agent.

(Cir. Tech. 3/1980)