7. Isolation/Preparatory stoppings around depillaring areas—Since the provision of the isolation/preparatory stoppings is an essential precaution against danger from fire, it is proposed that, when a proposal for depillaring is approved in principle by this office, a letter would at first be issued to the management concerned intimating that the work of building the isolation/preparatory stoppings may be started and the JDMS may be informed as soon as the work is completed. The letter granting permission for depillaring (subject to such other conditions as may be considered necessary) would be issued by DGMS only after the stoppings have been provided to the satisfaction of the JDMS.

8. Standard of Construction of Isolation Stoppings to seal off goaved out depillaring areas or a Fire or spontaneous heating—1.0 Coal Mines Regulations 100(4) and 118A(1) (a)

read with the proviso to Reg. 18A(4) require, inter alia that, unless exempted in writing and except where solid stowing is practised, no depillaring shall be commenced unless isolation/preparatory stoppings or firedams have been provided around the area to be extracted.

1.1 Even in seams where extraction is carried out in conjunction with stowing, there have been instances of goaf fire. In exercise of the powers under the proviso of Regulation 118A(4)

therefore, provision of isolation/preparatory stoppings is also often required where extraction is practised with solid stowing. However, in such cases, stoppings may be provided to enclose relatively larger panel(s).

1.2 The purpose of provision of these isolation/preparatory stoppings around every panel or sub-panel is that the area could be sealed off expeditiously in emergency i.e. upon appearance of any sign of heating or after completion of extraction therein so that breathing of air into goaf and consequent heating is prevented. Incidently, to prevent the passage of air into the goaf from surface, subsidence cracks formed as a result of the depillaring operations should also be filled- up with incombustible material and the filling material well-rammed and kept topped-up as often as necessary.

2.1 Stoppings are also required to be constructed under Regulations 119 & 122 to effectively seaf off areas where heating is detected or fire exists.

2.2 Similarly, as required under Reg. 118a(l) as well as to belter utilise the available ventilation air in the mine and to obviate the constant efforts needed to deal with coal dust problems, stoppings are build to isolate the disused workings in certain cases.

3.0 The selection of site and the design, standard and manner of construction of isolation/preparatory stoppings under Regs. 100(4)/118A as also the stoppings to be build under Regs. 119 & 122 to isolate or control a fire or spontaneous heating belowground or to seal off/sectionalise disused workings shall be as follows:

3.1 Selection of site The site of stoppings should, as far as practicable, be free from cracks, slips and other disturbances and should be so selected that:

(i) the stoppings do not get affected by any extension of falls in goaf or by crushing/spalling of the corners/sides of coal pillars containing the stoppings. For this purpose, the stoppings may be sited at least 3 m away from pillar corner on the inbye side;

(ii) sufficient space is still available on the outbye side to enable stoppings to be:

(a) re-inforced, if they fail to contain the fire, if any; or

(b) converted into explosion-proof stoppings subsequently, still leaving about 3 m distance between the second stopping and the pillar corner on the outbye side.

3.2 Design of construction 3.2.1 All stoppings shall unless otherwise provided for here under be of bricks in lime/cement morter.

3.2.2 Minimum thickness of stoppings shall be as follows:

Gassiness of seam Minimum thickness of stopping in case of extraction REMARKS by caving method with slowing (of all voids and galleries upto the stoppings)

III degree I and II degree Two stoppings each 1 m. 1 m thick and 4.5 m apart, with the intervening space packed soid with incombustible material 1 m to be reinforced as in case of III degree, if inflammable gas behind the stoppings exceed 2% 1m 0.5m I. an area, only partly extracted and slowed is sealed-off prematurely due to healing or otherwise, the stoppings shall be re-inforced as in case of extn. by caving method.

In gassy seams of I degree, stoppings may also be built of RCC provided the thickness is not less than 0.3 m.

3.2.3 Minimum depth of 'locking' of both brick and RCC stoppings into roof, floor and sides should be as follows:

Brick in cement/lime mortar RCC.

—in coal one metre 50 cms —in shale roof/floor 30 cms 30 cms —in sandstone roof/floor 15 cms 15 cms 3.2.4 To enable the areas to be sealed-off expeditiously in case of emergency, every preparatory slopping shall be filled, on its inbye side, with a suitable steel door or provided with an emergency door seal as per DGMS Circular No. 19 of 1967. Sufficient stock of bricks and other material shall also be kept readily available in the vicinity on the oulbye of the stoppings.

3.2.5 The exposed face of the stoppings as well as the roof, floor and sides of the gallery on oulbye side, for a distance of at least 1 m there from, shall be plastered with sufficient thickness of lime or cement to prevent leakages.

3.2.6 Where water is likely to accumulate behind any stopping there shall be provided in the stopping 'water seal' viz. a suitable pipe or other device to drain away the water without permitting any leakage of air or gas.

3.2.7 In a few strategically located stoppings, including at least one on rise side, air-sampling pipes, 25 mm or 50 mm in dia filled with suitable sluice valve/cap should be provided, for ascertaining, once at least in every 30 days, the atmospheric conditions behind the stoppings. The sampling pipes should be extended upto a distance of at least 3 m inbye of the stoppings. Some of the sampling pipes should be placed within 30 cm of the roof.

3.2.8 While sealing off disused workings in gassy seams of Second or Third degree, large diameter pipes (say 45 cm) with suitable valves/flanges may be provided in some of the isolation stoppings both on the intake and return sides to enable 'bleeding off the sealed off areas as and when required. Also, in order to render later entry into the area more convenient, it would be advisable for a door to be installed at the inbye end of one of the stoppings each on the return and intake sides before the rest of the thickness is built in with masonary.

3.2.9 The stoppings should be kept properly white-washed to enable fine cracks to be detected, and serially numbered. The approach roads upto the stoppings including the stoppings built around the goaved out areas of panel(s) not yet fully extracted and sealed off, shall be kept well- supported, properly ventilated and clear of obstruction to enable weekly inspections thereof to be carried out in a proper manner. The records of inspections should be maintained isolation slopping wise.

4.0 The pillars containing isolation stoppings should not be extracted or reduced.

5.0 This supersedes DGMS Circular No. 49 and 55 of 1962, 37 of 1963, 17, 25 and 30 of 1964, 23 of 1965 and 1 of 1968.

(Cir. Tech. 3/1988)