11. Accidents due to fall of roof in coal mines : Causes and prevention—Accidents due to movement of strata has been, and is, the major concern of mining engineers as withdrawal of natural support is a logical sequel to the process of mineral exploitation in underground. Over the years, compiled statistics of accidents in Indian coal mines identified the major cause of mine accidents as ‘fall of roof ’.

In 1980, the fifth conference on safety in mines reviewed some of the developments in support technology and emphasised the need for further work in this direction. The sixth conference on safety in mines (1986) made some pioneering recommendations as regards to 'Accidents due to fall of roof & sides' and suggested some basic changes in the process of formulation of support plan, which were duly followed up by seventh conference on safety in mines (1988). The eighth conference on safety in mines (1993) made some vital recommendations regarding the use of Rock Mass Rating in formulating support design and adoption of roof bolting as a method of support.

The Coal Mines Regulations were amended in 1990, to provide statutory backing to the recommendations of the sixth conference on safety in mines. As per the amended provisions of Reg. 108 of CMR' 1957, the manager of every mine is required to frame and enforce systematic support rules for supporting, amongst others, the roof within 10m of working faces with due regard to the physico-mechanical properties of strata, local geological conditions, system of work, mechanization and past experience. Regulations 109 and 110 of CMR' 1957 were also amended to take care, inter-alia, of different types of steel supports being introduced to replace traditional timber supports. In this connection, Technical Circulars [D.G.M.S.

(Tech.) (Sapicom) Circular, No. 3 of 1993, Circular No. 6 of 1994 and Circular No. 3 of 1995]

were issued concerning the methodology of support design, use of roof bolts in coal mines and fatal accidents to underground coal mines respectively.

1.0 ACCIDENTS DUE TO STRATA MOVEMENT-REVIEW Statistics of accidents due to movement of strata has been sending warning signals to all concerned for quite some time. In coal mines, as many as 10 recorded disasters (about 20% of the total) involving 140 deaths were caused by the movement of strata. The trend analysis of accidents in last ten years points to the fact that 'fall of roof continues to be the predominant cause of fatal accidents in underground coal mines.

A critical analysis of different aspects of roof fall accidents spanning a period of four years (1992-95) has revealed many interesting details relating to the event:

• A Substantial percentage of accidents (34% to 43%) occurred involving 'coal' roof.

• Thickness of fall in 70% to 85% cases was less than 0.5m.

• Roof bolting was not practised generally, even in coal roof (only about 13% coal roof was supported by bolting).

A sample analysis of accidents for the period from 1992 to 1995, where roof bolting were used as primary means of support, revealed that:

• Support by roof bolting was either inadequate or got dislodged/was not provided at all.

• In most of the cases, accidents were caused due to 'system failure'.

2.0 SUPPORT APPRAISAL IN BORD AND PILLAR WORKINGS IN COAL MINES With the advent of modem coal mining techniques associated with increased mechanisation or solid blasting, it has become imperative to adopt 'Roof bolting' as a primary means of support in place of traditional timber supports which act as a hindrance for achieving higher productivity, apart from economic and socio-ecological considerations. The fusion of this state-of-art support technique vis- a-vis methodology of mining in underground coal mines started only a decade back and the process of assimilation is still not complete as yet.

2.1 In this back-drop, an accident took place in a coal mine in 1990 (where cable bolts were used as an exclusive means of support in a development area) killing four persons. This accident jolted all concerned associated with the introduction of this new system of support. The observations at the site of accident revealed that:

• Support was not provided in a systematic manner.

• Support density was not adequate.

• Holes drilled for installation of cable bolts were 1.0m deep.

• Cable bolts were not grouted for the full column in cement and sand mixture.

• No anchorage tests were carried out to ascertain the efficacy of installed cable/rope bolts.

• No study on strata movement monitoring was conducted.

2.2. In the light of this unfortunate occurrence, it was thought appropriate to carry out an appraisal of support system where roof bolts were in use as principal means of support, encompassing a broad spectrum of geo-mining conditions and an array of work systems, to identify the grey areas required to be atoned. In 1991, a study was undertaken in coal mines to look into the details of (a) formulation of support system and (b) strata and support behaviour monitoring. The finding of the study covering 15 mines of 5 different coal companies was summarised as follows:

(a) Roof bolting was applied in most of the mines without assessing the support requirement on the basis of RMR, leading to under designing or over designing of support system.

(b) Monitoring of support performance did not receive the attention. In all the cases, the percentage testing of bolts for their anchorage capacity was far below the required 10%, recommended by the expert committee.

(c) Records of such limited number of testing carried out were not even maintained in proper manner.

(d) The monitoring of strata behaviour was literally non-existent.

To sum up, it could be inferred from the study that the progress of absorption of 'Roof Bolting systems designed on the basis of RMR' in Indian underground environment was poor and incomplete largely due to lack of a comprehensive approach. This gross deficiency may have serious consequences from the point of view of safety.

Efforts were made to correct the various imbalances but without much success.

2.3 In 1996, a roof fall accident took place in the development district of a coal mine killing four persons and seriously injuring five. In this district roof bolting was used as primary means of support. An investigation was conducted to ascertain the efficacy of support system in the development district of the mine where accident took place. The investigations revealed that:

(i) Assessment of installed support system— Support of roof in the galleries and at the junction (accident site) was grossly deficient. Only about 25% and 15% support was provided at galleries and junctions respectively.

(ii) Support accessories— 15mm dia. roof bolts rods were used in place of 20-22mm diameter M.S./Tor-steel rods. The hole diameter was 20-22mm larger that the bolt diameter whereas the said value should be between 8-12mm. This larger annular space in the hole may cause increase in grout consumption and 'Sheath effect' i.e. poor mixing of the grout constituent resulting in 'poor' anchorage.

(iii) Cement Capsules—The infrastructure provided for the manufacture of the cement capsule was not adequate, there was no mechanism to monitor the quality control aspects of the (a)

ingredients/chemicals used in the capsules, and (b) prepared cement capsules. It was revealed that :

• The mixing operation was not generally supervised by skilled/ experienced person.

• Indentification number(s) was/were not given to prepared cement capsules.

• No record whatsoever detailing the composition of the manufactured cement capsules was maintained.

(iv) Installation of roof bolts— The roof bolts were not installed in a systematic manner. The spacing between the holes in a row and the distance between rows were not maintained. Moreover, the holes were drilled in different directions with widely varied angle of inclination. Bearing plates were also not provided in the roof bolts.

As far as systematic installation of roof bolts was concerned, the enquiry revealed a distinct lack of understanding on the part of management (local mine operators) and supervisors. The level of awareness amongst them about the provisions of DGMS Circulars, concerning use of roof bolts in coal mines was dismal. Proper training was also not given by the management to the officers/supervisors, before and during the introduction of roof support by bolting, in the mine. The details of installation of roof bolts were not entered in the daily report book maintained by the supervisors of the shift concerned and no effort was made on the part of management to introduce a system of recording and monitoring, in this regard.

2.4 Assessment of roof bolting system—As a part of the study, laboratory and field tests Were carried out whose findings are summarised below :

At the accident site (junction of 6th D/R & 8th level), the results of testing point to the fact that although the bolts had a setting time of more than 72 hours, the anchorage capacity varied widely between 0 tonne and 5.4 tonnes. Further field tests conducted in the development district of the mine revealed that :

No anchorage developed after 2 hours setting (old seized capsules) with 15mm diameter roof bolts.

Anchorage developed after 2 hours, 8 hours & more than 24 hours setting (new cement capsules) with 22mm diameter roof bolts, were of the order of l.0 T, 2.5 T and 6.0 T only.

Apart from the above, collected samples of cement capsules and roof bolts (15mm dia) were sent to an approved Rock Mechanics Laboratory for ascertaining their efficacy as support material.

The results of the said tests revealed that the anchorage developed after 2 hours & 8 hours setting was of the order of 0.0 T & 0.25 T, respectively.

2.5 Monitoring of roof bolts—Only one anchorage testing machine was available for testing of installed bolts in three different district of three different pits which was totally inadequate to meet the standards of testing as envisaged in DGMS (Tech) (Sapicom) Circular No. 3 of 1993. About 2.5% installed bolts could be tested for ascertaining their anchorage capacity and a maximum 5 tonnes load was applied during testing. The records of such tests were not maintained in proper format resulting in loss of much valuable information required for carrying out an analysis on the performance of the support system and adoption of corrective measures, if needed. Proper training was also not imparted to the officers/supervisors, incharge of testing operations, on systematic monitoring of roof bolts.

2.6 Strata behaviour monitoring—No study was conducted by the management to monitor the behaviour of roof rock supported by bolts, as envisaged in D.G.M.S. (Tech.) (Sapicom) Circular No.

3 of 1993.

3.0 RECOMMENDATIONS A review of roof bolting practices has revealed that although bolting was used as primary means of support in some selected coal mines, proper attention was not given to design, installation and monitoring procedure of roof bolts, thereby jeopardising the safety of work persons. Keeping in view the guidelines contained in DGMS (Tech.) (Sapicom) Circular No. 3 of 1993. Circular No. 6 of 1994 and Circular No. 3 of 1995 read with Reg. 108 & 109 CMR' 1957 the following steps may be taken to effect qualitative improvement in the existing scenario :

3.1 Systems approach— An integrated systems approach to develop the support design and implement it in the mine in the form of an action plan (annexure-I) for coal mines, is suggested.

3.2 Design of roof bolting system—The assessment of support requirement should be done on the basis of Geo-mechanics classification approach, as recommended vide D.G.M.S.

(Tech.) (Sapicom) Circular No. 3 of 1993, for particular geo-mining condition. Whenever changes are proposed in roadway dimensions or methods of working, or where geo-technical conditions change, further design verification by fresh RMR studies needs to be carried out to assess the continued validity of the design.

3.3 Support materials—The following materials should only be used.

3.3.1 Roof Bolts Materials: Tor-steel/M.S. (IS : 1786-1985/IS : 226-1975/IS : 1570 Rod length: 1.5m Rod diameter : 20-22mm (ribbed bar)

Length of the thread : 125-150mm 3.3.2 Bearing plate (IS : 226-1975)

Material: MS Size: 150mm sq. or equivalent Thickness: 6mm 3.3.3 Nut (IS: 1363, Part-3, 1984)

Shape: Hexagonal Height: 20mm 3.3.4 Cement capsules Length: Not exceeding 400mm Diameter: 30-32mm Type: Quick setting (the grout should provide a minimum anchorage of 3T after 30 minutes, and 5T after two hours of setting.)

3.3.5 General requirements

(a) Roof Bolts shall be commercially straight, sound and free from harmful surface defects.

(b) Threads in the bolts shall preferably be rolled so that the strength of the bolt is not reduced.

(c) The threads on bolts and nuts shall conform to tolerance class of 8g and 7H respectively (IS; 4218-1967).

(d) Nut shall be compatible with bolt.

(e) Threads of the bolts shall be kept lubricated and suitably protected.

(f) Bolts/capsules shall be marked with the following information at visible places:

(i) Manufacturer's name

(ii) Dia. of the bolt/capsule

(iii) Length of the bolt/capsule

(g) Packing (i)

Bolts shall be packed in cleaned condition

(ii) The cement capsules shall be packed suitably with batch no., month of manufacture etc., so that they are not damaged during transit.

(h) Quality control: Strict quality control shall be exercised during manufacture of the cement capsules/roof bolts. The manufacture of cement capsules/roof bolts should be batch tested before packing and dispatch.

3.4 Installation of roof bolts— Roof bolts should be installed, as soon as the roof has been exposed, incorporating following steps, under the direct supervision of an Under Manager/Overman.

3.4.1 Drilling of holes— As per design, the holes should be drilled to the correct diameter and length, with a suitable drill. The hole diameter, should not be more than 8 mm to 12 mm larger than the bolt diameter, for full column cement grouted bolts. Due care should be taken to maintain the verticality/inclination of the holes.

3.4.2 Grouting of roof bolts— Where fast and slow bonding materials are used together (i.e.

in case of pre-tensioned grouted bolts) it should be ensured that fast capsules are inserted first. All operations shall be carried out under supported roof (temporary support).

The following steps in sequential order shall be taken to install the roof bolts :

(a) Soak the cement capsules (quick setting type) in water and allow it to absorb water until the bubbling ceases.

(b) Remove the capsules from water and insert into the bore hole. Push the capsule to end of the bore hole.

(c) Tamper firmly with a stemming rod until the required number of cement capsules have been inserted.

(d) Insert the rock bolt into the hole and push it home.

(e) If necessary push the rock bolt to the-bottom of the hole with suitable mechanical means.

(f) Fit a bearing plate and a nut. Tensioning should be provided only after the prescribed setting time has elapsed.

3.5 Monitoring of support performance— At least 10% of installed roof bolts should be invariably subjected to anchorage testing (at random) under the direct supervision of Under Manager and the results of such tests should be maintained in the prescribed format (Annexure-II). The minimum anchorage strength of the bolts should not be less than that of value, which has been considered for design of support system. The following points should be kept in view, while conducting testing.

3.5.1 Testing should be always carried out under a properly supported roof, with a suitably designed anchorage testing equipment.

3.5.2 The roof bolt load should be increased smoothly and gradually. About 9% bolts should be tested upto the designed capacity and rest 1% may be subjected to destructive testing.

The tested bolts should be identified with tags bearing the record of load applied on them.

3.5.3 The anchorage testing equipment should be subjected to regular maintenance and calibration.

3.6 Monitoring of strata behaviour—Measurement of roof-floor convergence should be an essential part of monitoring strata behaviour scheme. A suitable approach may be used for estimating the critical value of the convergence vis-a-vis gallery size and Rock Mass Rating, in a particular gee- mining condition.

3.7 Supervision—Roof bolting operations in the mine may require the service of a group of dedicated technically qualified personnel headed by an Asstt. Manager/Strata officer.

(Cir. Tech. 3/1996)