Skip to content

Cir. Tech. 8/1983

Notice of overwinding ,while lowering raising of materials

Department
Technical
Year
1983
Collection
Regulation-wise digest (to 2017)
Under
CMR9/MMR9
In the DGMS Circulars (up to June 2017) compilation, p. 17.
Open PDF at page 17

9. Notice of overwinding ,while lowering raising of materials—Notice in Form IV-A is required to be furnished to the prescribed authorities vide Reg. 9(1 )(a) (xi) of CMR 1957 [and the corresponding Reg. 9(1 )(a) (xi) of MMR 1961] whenever there occurs in or about a mine an overwinding of cages or other means of conveyance while men are being lowered or raised. Thus according to the said regulation, such a notice is not necessary when an overwinding occurred during material winding operation.

By virtue of Section 23 of the Mines Act, 1952, however, a notice is also required to be furnished to the specified authorities in prescribed form when an overwinding of cages or other means of conveyance occurs while materials are being raised or lowered. Since the regulations are made under the Mines Act, the provisions of the Act shall prevail over the regulations. Managements are therefore, advised to comply with the requirements of the Act in the matter of submission of notice as stipulated in Clause

(e) of sub-section (1) of Section 23 of Mines Act, 1952.

(Cir. Tech. 8/1983)

Reproduced from the official DGMS circular compilations for public reference. The PDF is the authoritative text; DGMS may have amended or withdrawn older instructions since.

← Search all circulars