DGMS Circular (Technical) No. 07 of 2013
Use of Continuous Miners in belowground workings of Indian Coal Mines
- Department
- Technical
- Dated
- 22.08.2013
- Collection
- Circulars 1995–2017
- Topic
- Circulars and notifications, 1995–June 2017
DGMS Circular (Technical) No.07 of 2013 Dhanbad, dated 22.08.2013 To All Owners/ Agents/ Managers of all Coal Mines.
Subject: Use of Continuous Miners in belowground workings of Indian Coal Mines.
1.0 On 1st and 2nd August, 2013, a two days' technical workshop was organized at DGMS(HQ), Dhanbad to deliberate upon issues related to standardization of various approaches/processes/operations vis-a-vis use of Continuous Miner technology in belowground coal mines for better understanding and enhancement of overall standards of safety, productivity and efficiency. The workshop was well attended by over 125 representatives from various coal companies, machinery manufacturers, private contractors, research organizations, educational institutions apart from officers of DGMS. 15 technical presentations were made by the participants during the workshop on various related subjects by various stake holders.
2.0 As a result of the deliberations on a wide range of connected subjects in the workshop, the following recommendations emerged.
2.1 Strategic Prior Planning for the technology at Corporate levels:
a) The suitability of any seam/section earmarked for exploitation by Continuous Miner technology shall be studied in depth by mining companies with the active engagement of DGMS, specially in respect of maximizing coal extraction/conservation while sustaining highest levels of operating safety.
b) Mining companies shall ensure macro & micro geological mapping of the area proposed for exploitation along with a detailed study report on their influence on pillar/part-pillar stability during exploitation/extraction.
c) The most suitable and scientific exploitation of the area proposed for exploitation by Continuous Miner Technology shall be formulated by the mining companies with active engagement of the internal R&D cells, scientific organizations and DGMS.
d) Mining companies shall ensure an effective and continuously available coal evacuation system from the area proposed for exploitation by Continuous Miner Technology to ensure that operations at the producing front are not interrupted any time with attendant dangers of serious strata management issues.
e) Mining companies shall ensure provision and availability of commensurate ancillary arrangements like advanced and high speed supporting systems, etc., in the exploitation area.
f) Mining companies shall ensure a properly functional Strata Management Cell at mine/Area level in accordance with Recommendations of the 10th Conference on Safety in Mines, with adequate staffing and infrastructure.
g) Mining companies through their respective R&D cell & in consultation with DGMS and scientific organizations, shall formulate effective goaf inertization programmes for preventing danger of fire/explosion and for avoiding pre-mature stoppages of operations thereby, minimizing strata control problems and also enhancing panel life.
2.2 Statutory Compliance Ensurance System:
Mining companies shall evaluate the statutory compliance aspects of the prospective OEMs before initiating actions for feasibility studies. Systems shall have to be so planned that the minimum required statutory stipulations are satisfactorily met with through-out the lifespan of the system.
2.3 Implementation of Dynamic Strata Monitoring and Management Systems:
R&D Cell and the Strata Management Cell of Mining Companies, along with the engaged Scientific Organizations
a) shall develop expertise in adequate understanding of the likely strata stress re- distribution taking place in the Continuous Miner workings due to very high speed mining operations, and also the ability to forecast problems well in advance to enable course correction, if required.
b) shall, in consultations with DGMS, formulate both short-term and long-term strata monitoring strategies with optimized locations and the extent of penetration required for study purposes in three dimensional terms.
c) shall ensure that suitable joint machinery is developed for the purpose of real-time analysis of the dynamic data generated in the CM workings.
d) shall ensure that the engaged monitoring regime has the necessary in-built dynamism to address the ultimate objective of instantaneous assessment on a developing situation for use by the front-line officials manning the mining operations at the work places.
2.4 Training & Education Scheme:
Mining Companies with the active engagement of the respective OEMs shall arrange for
a) adequate training/re-training/education/exposure of the key mining personnel at mine level to the essential requirements of the technology, including those engaged on strata monitoring,
b) commensurate skill up-gradation of the scientific organizations/educational/research institutions and
c) schemes to inculcate work-site discipline amongst the onsite operating crew.
2.5 Formulation of SOPS, Codes of Practices, etc:
Mining Companies with the active engagement of the respective OEMs shall formulate effective SOPs, Codes of Practices customized to their respective needs based on Risk Assessment. Safety Management Plans formulated by Risk Assessment processes shall be made integral to the production mechanism.
2.6 Use of latest Scientific and IT tools:
Mining Companies shall encourage use of advanced scientific tools, computing techniques, IT, etc., in various stages of planning and policy execution. Persons manning the strata control cells may be trained effectively on use of Numerical Modelling techniques for accurate planning, prediction and implementation.
2.7 Emergency Management System:
Mining Companies with the active engagement of the respective OEMs shall ensure adequate logistics in terms of both men and material for dealing with all exigencies connected to deployment of CM.
2.8 R&D Initiatives:
Mining Companies shall in consultations with DGMS, associate fruitfully in various Research& Development activities taking place both nationally and globally specially on developing adequate understanding of complex stress redistribution scenario likely in multi-seam/section operations, simultaneous extraction, geologically challenging areas, etc., so as to design appropriate optimized extraction schemes.
3.0 Owner, Agent and Manager of coal mines operating Continuous Miner technology in their .
belowground workings are requested to take appropriate actions to implement the above recommendations which will ultimately go a long way in sustaining highest standards of safety and productivity in mines.
(Rahul Guha)
Director General of Mines Safety.