No. DGMS (Tech)/Circular No./ 13 Dhanbad, Dated – 17.11. 2009 To, Owner/Agent/Manager of Underground Coal Mines.

Sub:- Telemonitoring System and their features for use in Underground Coal Mines.

Telemonitoring System for continuous monitoring of inflammable/toxic gases, air velocity, etc., are not new to the underground coal mines of the country. Such systems have been in use in some of the highly mechanized underground coal mines with history of high gassiness and proneness to spontaneous heating. This scenario is however slowly changing and more and more such systems are now being introduced in all such mines as an effective means to detecting inflammable/noxious gases and spontaneous heating in nascent stages, thereby enabling suitable mitigating measures to ward of likely disasters.

However, recent inspections of a large number of such installations by the officers of this Directorate revealed the dismal state of affairs as regards their installation and maintenance. Invariably, the system were found to be either faulty of non-working, thereby defeating the very purpose of their installation in difficult working situations.

It was also revealed that there was no reliable mechanism to ensure the health of such installed systems on a long-term basis. The gravity of the situation was intense because of the working of such faulty system. In mines with a potential to give misleading information on gas concentrations, etc. The consequences of such misleading information in potentially grave situation in difficult mining conditions do not need any elaboration.

As such, the matter was thoroughly deliberated upon in a tripartite technical workshop held on 9th of October, 2009 in this Directorate at Dhanbad, attended by the representatives of the management, manufacturers and this Directorate for resolving various connected issues, and the following collective decisions were arrived at.

1.0 The basic components of a Telemonitoring system :- A telemonitoring system for use in underground mines shall consist of the following as essential basic components.

 Various sensors.

 A display unit.

 Surface monitoring system for display, storage and retrieval of readings and also a warning system.

 Power supply system.

 Electrical power tripping arrangements.

 Connected data transmission cables.

2.0 Underground display unit of the telemonitoring system :- Proper display arrangements shall be provided at surface and also in the underground installation at the out-stations and with sensors. The display shall be clearly visible from a reasonable distance. The display system shall also be provided with a colour changing/blinking arrangements for indicating any recording of an environmental parameter above the pre-set value.

3.0 Various parameters of the sensors as records (a) minimum operating life of sensors, (b) working limits of temperature & relative humidity, (c) calibration including the maximum permissible deviation when tested with standard gases, frequency of calibration, availability of standard gases and various records to be maintained thereof :- a)

The minimum operating life of the sensors shall be as follows.

Sensors Type Operating Life CH4 (Infrared)

5 years.

CH4 (Catalytic)

2 years.

CH4 (Elecro-chemical)

2 years.

CO 2 years O2 1 year b)

Workings limits of temperature - Not more than 50 C Workings limits of Relative Humidity - Upto 100% c)

Calibration (i)

The deviation of the measured gas concentration shall not be more than 3% for all sensor types when tested with standard gases.

(ii)

The maximum interval of calibration of sensors shall not exceed three months, alternating between the OEM and the users. However, The OEM shall examine the complete telemonitoring system in totally at least once every six months.

(iii)

Adequate samples of standard gases shall be always made available at the concerned mine.

(iv)

Proper records of calibrations done, duly singed by the designated officer and the Manager for the purpose, shall be maintained at the mine.

4.0 Use of the approved system in the mines :- Any sale/purchase of the continuous telemonitoring system shall be in conformity with the approved system in respect of all the basic components as mentioned above.

5.0 The minimum required power back up with the telemonitoring system:- The minimum required power backup in the event of disruption of the main electrical power supply shall be for a period of four hours.

6.0 Alarm system in the telemonitoring system :- The minimum intensity of the audio part of the audio-visual alarm provided with the telemonitoring system shall be 90 dB(A). In the underground workings, at least one audio alarm shall be provided with every out-station of the telemonitoring system.

7.0 Electrical interlocking of the telemonitoring system :- The tripping circuit of the telemonitoring system shall be electrically interlocked with the power supply system of the connected workings so as to cut off power supply when the concentration of inflammable gases measured exceeds a preset value.

8.0 Recording of telemonitoring events on surface :- Every telemonitoring installation shall be provided with an arrangements for recording and retrieving data on a continuous basis.

9.0 Maintenance of the telemonitoring system :- Every telemonitoring system shall be associated with a comprehensive Annual Maintenance Contract (AMC) with the OEM to cover both for spares and services. The period of AMC shall be not less than 5 years. The maximum response time for attending to any maintenance related problems shall not be more than 24 hours.

It is therefore, requested that the above mutually agreed recommendations are implemented strictly in respect of all telemonitoring system installed in underground coal mines. For ensuring efficient working of such systems on a long-term basic, the ISO shall have suitable time bound action plans and shall rigorously follow-up with the same.